Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
The Town currently repairs sidewalks based on the roads with the oldest complaints. The Engineering Department re-inspected the site on 8/3/2021. We have determined that the sidewalk, walkout, and driveway apron do need to be repaired/replaced. Based on current funding, we do not have a good estimate on when the replacement will be conducted. The site has been added to our master list for repairs.
3 Comments
Hamden, CT (Verified Official)
ADIは、 Staff Engineer (Verified Official)
Engineering Inspector (Verified Official)