الوصف
Sidewalks and curbs are desperately in need of replacement. The entire street from Elm City Academy from Dixwell down to Bowen St. was re-done. Yet, they stopped the construction at Bowen.
Sidewalks and curbs are desperately in need of replacement. The entire street from Elm City Academy from Dixwell down to Bowen St. was re-done. Yet, they stopped the construction at Bowen.
1 تعليق
مغلق SeeClickFix Admin (تم التحقق رسميا)