说明
This street was patched both NB and SB but needs to be ironed out by a “Steam Roller”. The attempt to patch the road made it more rough and bumpier. Please fix. There must be some guarantee for the work to be done correctly.
This street was patched both NB and SB but needs to be ironed out by a “Steam Roller”. The attempt to patch the road made it more rough and bumpier. Please fix. There must be some guarantee for the work to be done correctly.
4 评论s
Coco (注册用户)
关闭 Brian M., Street Section (注册用户)
Reopened Art (注册用户)
关闭 Brian M., Street Section (注册用户)